Installation Overview
Lay out your route, fasten the mounts, then press the tubing into place and align.
Preparation
Measure & Mark Runs
Sketch the path. Mark mount spots for straight lines and even spacing.
Check Tubing Fit & Orientation
Confirm the mount grips 3/8″ OD line. Plan where nozzle ports will face.
Install
Seat the Mounts
Attach mounts with suitable screws or anchors for your surface.
Secure & Align Tubing
Press the tube into each mount. Keep the line level and untwisted.
Spacing for Clean Lines
Support long spans. Many installs mount every 24–36 inches.
Pressure Test
Bring System to Operating Pressure
Restore water and power. Let pressure stabilize.
Inspect for Rattle & Adjust
Listen for vibration. Add a mount near corners or fittings if needed.